okay. friday was bad. there is potential for this to be a long, drawn out story, but i will spare you and provide you with the "highlights," as they were.
while moving my six sections of 13-ft long pipe out of the building in which they were being stored so that they could be moved up the wetland, i broke a window.
upon arriving at the wetland with the pipe, i realize that i don't have enough pipe length. at first i think that this is because i suck at math and figured out the wrong length using the scale off the plan. after a bit of measuring i realize that my math is fine; the scale on the plan is wrong. i go the the hardware store and purchase more pipe.
after hours of digging with a back hoe looking for a pipe junction that is buried 7 feet below the ground, we realize that, once again, the plan is wrong. the junction is nowhere near where it is drawn on the plan.
we refill the large, 7-ft deep original hole and re-dig a new large, 7-ft deep hole. yet again, no pipe junction. this time, someone comes up in a truck and tells us that our hole is too deep and we need to re-fill and get out of there or we'll get fined. fantastic. still no pipe junction.
i'm thrilled, really. my masters research is yet again put on hold b/c someone who should have had access to all of the original plans for when the pipe was first laid made me a plan without looking at those original plans. which gives me, quite frankly, crap to work with. i could have had a four year old crayon-draw me something more useful. gahhh!!!
on a brighter note, today i'm going to help april and mark paint their new house. i love painting :).
No comments:
Post a Comment